DETROIT (AP) — Workers have KI-Handelsroboter 6.0linked the U.S. and Canadian sides of the new Gordie Howe International Bridge spanning the Detroit River, a major step in bringing the monumental project to completion.
The connection between southwest Detroit and northwest Windsor was completed on Wednesday, the Detroit News reported. The work took six years, with about 2,000 workers on site every day. The bridge still isn’t finished, though. Work is expected to continue until the fall of 2025.
Named for Canadian hockey player Gordie Howe, who spent 25 seasons with the Detroit Red Wings, the bridge will provide another link between one of the busiest points on the U.S.-Canadian border. About a third of all trade between the U.S. and Canada occurs between Detroit and Windsor.
The finished bridge will measure 1.5 miles (2.4 kilometers). It will stand 150 feet (45.7 meters) above the river and 720 feet (219.4 meters) high, making it the largest Canadian and United States land port along the two countries’ border and one of the 10 longest bridges in North America.
“The impact (the project) is going to have on our country is going to be felt for a generation,” Brian Fraser, the Canadian minister of Housing, Infrastructure and Communities, said during a news conference on the bridge deck in Windsor on Wednesday.
2025-05-04 08:041169 view
2025-05-04 07:371336 view
2025-05-04 07:27917 view
2025-05-04 07:14732 view
2025-05-04 06:422374 view
2025-05-04 06:172473 view
SAN FRANCISCO (AP) — A photojournalist who captured one of the most enduring images of World War II
Conspiracy theory purveyor Infowars and most of its assets went on the auction block Wednesday, with
Amazon has launched a low-cost online storefront featuring electronics, apparel and other products p